SkyTrain service change in downtown Vancouver

This article was published on October 13, 2009 and could contain information that has since changed or become out-of-date.
Please be mindful when reading, commenting on, or sharing this article.

Beginning on October 14th 2009, TransLink will be performing repair work in the Dunsmuir Tunnel on the route used by Expo and Millennium Line SkyTrains, to address water seeping into the 77 year old tunnel.  This work is scheduled to be completed by December 11th, 2009

Starting at 9:45 PM PDT until the end of service, trains headed to Waterfront will stop at the Stadium-Chinatown Station. A shuttle train has been setup to run on the outbound track and will stop at Granville, Burrard and Waterfront Stations running on 12 minute intervals.

TransLink recommends taking an extra 15 or 20 minutes during travel during this time. SkyTrain Attendants will be available to assist during the service changes.

SkyTrain service will be running at normal levels on October 28th, November 5th, and November 11th, 2009. Canucks fans may experience some minor delays as the work also falls on a number of home games at GM Place.

Full details are available on the TransLink web site.

 

Did you find a typographical or factual error in this article? Please let us know!